Action Reference
References the action state of actions, action groups, controls, or control groups within the project. The condition is met if the current state of the referenced action matches the set state, otherwise the condition is not met.

[Reference]
Select the action, action group, control, or control group to reference.


[Status]
Select the action state of the referenced target.

- Not Started: The referenced target has not been executed yet.
- Running: The referenced target is currently executing.
- Complete: The referenced target has completed execution.
- Error: An error occurred while the referenced target was executing.